EnviroTrac News

Sep
03
Sharon, MA (September 3, 2015) – EnviroTrac Ltd. (EnviroTrac), a full service environmental consulting, engineering and remediation firm welcomes Craig Blake as Senior Project Manager in the Sharon, Massachusetts office, just south of Boston. With over 38 years of experience in engineering and the environmental consulting industry, Craig spent the last 17 years with Woodard & Curran where he was a Vice President/Senior Project Manager in their Dedham, MA office. In addition to being a... + read more
Sep
01
Yaphank, NY (August 31, 2015) – EnviroTrac Ltd. (EnviroTrac), a full service environmental consulting, engineering and remediation firm announced today that it climbed five positions on Engineering News Record’s (ENR) 2015 Top 200 Environmental Firms list to No. 167. “I am incredibly proud of this accomplishment. It’s the result of our people providing our clients with the service and expertise that they expect, and the fact that we deliver it each and every day,... + read more
Jul
28
Sharon, MA (July 23, 2015) – EnviroTrac Ltd. (EnviroTrac), a full service environmental consulting, engineering and remediation firm announced the opening of its North Andover Office, just north of Boston. As the firm’s second location in Massachusetts, EnviroTrac strengthens its commitment to supporting clients in providing its wide range of engineering, environmental consulting and remediation services. Led by Dennis Giustra, Principal Engineer and Licensed Site Professional... + read more
Apr
07
Yaphank, NY (April 3, 2015) - In the first quarter of 2015, EnviroTrac has been contracted to perform remediation at two state Superfund sites located on Long Island , NY. The first site, known as Jimmy’s Dry Cleaners involves soil excavation, installation of a Soil Vapor Extraction (SVE) system and In-Situ Chemical Oxidation (ISCO) to treat both onsite and offsite PCE/TCE ground water contamination. The project, worth over $3.4M is expected to kick off the second quarter of 2015. The... + read more
Jan
23
Yaphank, NY (January 23, 2015) – EnviroTrac Ltd. (EnviroTrac), a full service environmental consulting, engineering and remediation firm has been awarded a remediation contract by a large utility company. The project involves the fabrication, installation and start-up of a ground water Pump & Treat (P&T) system at a former Manufactured Gas Plant (MGP) site located in Staten Island. The project, worth $240,000, is expected to be completed in the first quarter of this year.

Pages

Subscribe to EnviroTrac News

Copyright © 2017 EnviroTrac Ltd. Back to Top Back to Top
 

24/7 Emergency Hotline: 1-800-652-5140

"Safety On ®"